QUANTA INFRASTRUCTURE SOLUTIONS GROUP | UTILITY-SCALE BESS CIVIL · v3.3
$0
CIVIL GRAND TOTAL (ADJUSTED) · USD
PROJECT INFO ▲
Custom LF:
DEMOLITION (BROWNFIELD) ▼
BESS EQUIPMENT ▲
SITE PARAMETERS ▲
Auto: calculating…
DRAINAGE ▲
Auto: calculating…
ROADS & SURFACING ▲
FENCING & GATES ▲
RETAINING WALLS ▲
Height ≤6': Segmental Block | >6': CIP Concrete
Enter face area (LF × height) only if an engineered MSE wall is specified instead of CIP for very tall sections.
OIL CONTAINMENT ▼
Auto: # xfmr pads × 200 SF
CIVIL INDIRECTS ▼
Mob/Demob, permits, surveys, locates — edit LS rates directly in table
Auto: uses perimeter fence LF
Typical 1–2%. Computed from civil subtotal (excl. bonding).
FIRE SUPPRESSION (DIV 9) ▼
Auto: calculating…
HELICAL PIERS (POOR SOIL) ▼
Use in soft soils (N60 < 10) where conventional spread footings are impractical. Fence posts and light equipment pads only — BESS containers and transformers require conventional foundations.
ELECTRICAL & UTILITY CIVIL (DIV 10) ▼
Civil scope only (trench, set, backfill). Cable/conductor supply & terminations are typically in the electrical estimate — verify no double-count.
BESS Site
Location not set | 100 MW / 400 MWh
C$/US$
Location Factor
Factor: ×1.00 | Adjustment: $0
Site Complexity Modifiers
(+30% D1, +15% D3, +10% D6)
(+20% D1, +25% D2, +20% D3)
(+15% D1, +40% D8)
(+20% D1, +20% D2, enables D7)
(+8% All Divs)
(+22% All Divs)
(+60% D1)
#
VMI / CBS
DESCRIPTION
UNIT
QUANTITY
UNIT RATE (US$)
EXTENSION (US$)
NOTES
REVIEW
ESTIMATE SUMMARY
DIVISION COST BREAKDOWN
FOUNDATION DESIGN TOOL — ACI 318-19Isolated Square Footing · Imperial · Verifies Div 3 Quantities & $/SF Rates
▼ EXPAND
PAD TYPE PRESETS
APPLIED LOADS
MATERIALS
FOOTING GEOMETRY
Select a pad preset or enter loads above, then click RUN to perform ACI 318-19 isolated footing design checks and compute concrete/rebar quantities.
c = (N60 / 8) × 1,000 psf — Bowles SPT cohesion correlation Nc = 9.0 — deep helical bearing (H/D ≥ 5, individual plate) Qt = ΣAi × c × Nc — ultimate capacity per pier T = Qt / Kt — required installation torque (ft-lbs)
Enter design load, N60, helix configuration, and pipe size — then click RUN to compute pier capacity, torque requirement, and pier count.
NEW IN v3.0 — VMI/CBS CODES | CIVIL INDIRECTS | FIRE SUPPRESSION | OIL CONTAINMENT
VMI/CBS Column: Every line item now shows VMI code (e.g., 600-EW-CLR) and CBS position (e.g., 7.1.1.1.1) for cost control integration
Civil Indirects (Div 8 expanded): Mob, Demob, Permits, Surveys, Locates, Temp Fence, Dewatering, PM/Supervision, Heating/Hoarding, Material Testing, Performance Bonding — edit sidebar for temp fence LF and bonding %
Oil Containment (Div 3 optional): Enable "Secondary Oil Containment System Required" in sidebar — adds HDPE liner + oil water separator line items to Div 3
Fire Suppression (Div 9 optional): Enable "Fire Suppression Civil Scope Required" in sidebar — adds full Div 9 with 11 line items (pipe, hydrants, FDC, water tank, etc.)
Demo (Div 1): Enable "Demolition (Brownfield)" in sidebar — adds building SF + pavement SY line items at top of Div 1
Pad Type (Div 3): "ISO Container Standard" ($36/SF) vs. "Rack-Mounted / Precision Cabinet" ($52/SF) — select in BESS Equipment sidebar
Screen Wall (Div 6): Enable "Urban Screen Wall (Masonry/CMU)" in Fencing sidebar — adds $/LF CMU screen wall row to Div 6
WHAT IS INCLUDED IN PAD RATES (Div 3)
Zone excavation to bearing elevation, spread footing or mat foundation
Form work, reinforcing steel (rebar per structural drawings)
Concrete placement, vibration, finish (broom or smooth per spec)
Anchor bolt assemblies / embedded plates (mfr-supplied or civil-furnished)
Backfill, compaction, surface restoration around pad
WHAT IS NOT IN THIS ESTIMATOR (Civil Scope Exclusions)
Underground electrical conduit, ductbanks, cable trench (electrical sub scope)
HV structure foundations — lattice towers, switchrack, bus support (structural/E&I scope)
Underground utilities — water, sewer, gas laterals (utility scope)
Geotechnical investigation and testing (owner or separate firm)
Building mechanical / electrical rough-in inside control building
Fire suppression mechanical equipment, valves, and controls (specialty scope — civil civil trench/pipe/structures included in optional Div 9)
Rates calibrated to 2025–2026 US Northeast market data. Research basis: dewatering, fire suppression, HDPE liner, oil/water separator, PM/supervision, mass grading, helical piers, detention pond, riprap.
This is a tool in development — all calculations must be validated by a professional.
↧ Export Estimate
Structured export mirrors the on-screen estimate (canonical Imperial units / USD, the calibrated basis) so numbers flow straight into cost-control & bid systems. Every export is stamped with the rate-basis version.
Branding (Excel & PDF header)
Pick a Quanta OpCo to brand the printed PDF & Excel header, or set your own. The OpCo marks are typographic; upload the official logo file to override for pixel-perfect artwork. Saved to this browser.
Quanta OpCo Preset
Company / Header Name
Subtitle (optional)
Official Logo (optional, < 400 KB — overrides the OpCo mark)
💾 Scenarios
Save named estimates to a library in this browser, reload them any time, and compare base vs. prevailing-wage vs. rocky-soil side by side. Each save is stamped with its rate-basis version.
Saved scenarios
Comparison
📋 Project Templates
Start from a generic project archetype instead of a blank canvas, then refine from your drawings. Loading a template replaces your current inputs (rate overrides are kept).
💡 Request a Feature
See something that would make the estimate better — a missing line item, a rate that looks off, a new input, a clearer output? Tell us. Your current estimate is attached for context.
Your request
Your Name *
Company *
Comment (optional)
Proposed rate (optional)
Applied as a rate override and routed to admin for approval.